Installation Guide
 ______________________________________________________________________________________ 
   Turf 
Evolutions, LLC   100 Executive Way    phone 866-966-TURF 
      Suite 108     fax 904-827-9426     
info@turfevolutions.com      Ponte Vedra Beach, FL 32082  www.turfevolutions.com 
Turf Evolutions Putting Greens Installation Process 
Below you will find an abbreviated installation process for our TruLine Bentgrass putting 
greens. Our greens have a true roll, and will hold a shot giving the player a very natural 
response. 
Base Construction 
1.  Remove the organic topsoil with skid steer or sod cutter and take off site. 
2.  At the depth of compactable soil, make sure 
the base is sloped to drain any water that may 
protrude into base cavity. Soils should be 
either crowned or sloped in one direction, then 
compacted with roller.  
3.  Depending on surroundings, a drain tile may 
be needed on low side of green to take water 
away from cavity. In this case, dig trench 
large enough to lay in clean drain stone, 4” 
perforated drain tile, and cover with another layer of clean stone. 
4.  Add and shape layer of ¾’- crushed stone within 2” of the height of surrounding 
grass, then compact with roller to 95%. 
5.  Add and shape 2” of stone dust to make final 
grade. The final grade should be a smooth 
and compacted  as possible with undulations, 
crown or slope that was shaped in step 2.  
6.  When compacting base you may have to keep 
material dampened to maximize compaction. 
**Base requirements may be less depending 
on region of the country. If solid sub grade in arid climate, may only need 2” on 
compacted fines/screenings. 




