INSTALLATION MANUAL I N S TA L L AT I O N M E T H O D Casa Cor Miami 2018 - Allan Malouf Architectural | Andres Henao PREMIUM SUSTAINABLE MOULDINGS Santa Luzia is part of Global's SME group, a member of Ellen MacArthur Foundation's CE100 Programme.
PREMIUM SUSTAINABLE MOULDINGS INSTALLATION METHOD I N S TA L L AT I O N M E T H O D G L U E A N D D O U B L E - S I D E D TA P E TOOLS AND INSTALLATION MATERIALS TOOLS • Measuring tape • Fine tooth saw 96 teeth & Miter box or compound miter box • Pencil • Safety goggles • Safety mask • Hammer • Putty knife • Caulking gun MATERIALS • Santa Luzia Mouldings • Heavy Duty Construction Adhesive or Polyurethane Compatible Adhesive: Suggested Glues: • Loctite - Power Grab Express 10.4 fl. oz.
CUTTING METHODS FOR SANTA LUZIA PRODUCTS SEAMS IN PROFILES’ MERGER 1 2 1 - When starting to install Santa Luzia Mouldings on wide walls, you may need to combine multiple profiles. For that, cut the profiles’ edges in 45º angle. 2 - Connect the profiles in a way one cut completely covers the other. 90º DEGREES SEAMS FOR WALL CORNERS 1 2 1 - Cut the merging profiles in 45º angle, starting with the main face. 2 - One of the profiles need to be cut backwards for joining with the other.
INSTALLATION METHOD GLUE AND DOUBLE-SIDED TAPE Before beginning the installation, analyze the wall type to choose the best installation method. 1 1 - With a cloth, remove all the wall dust. 2 - Our Mouldings need to be cutting quickly and accurately. Make the necessary cut, according to the cut method of this manual. 2 3 3 - With the aid of a cloth, remove all waste from the bar. 4 - Apply small pieces of approximately 1 ½" with spacing between the tapes of maximum 15".
INSTALLATION METHOD FOR PLINTHS BLOCKS AND ROSETTES USE GLUE 1 1 - With a cloth, remove dust from the wall and piece. 2 - Apply a thick layer of glue across the piece brock. 2 3 - Place the piece very close to the wall and align it against the floor. 4 - Press firmly against the wall for a better adherence. 3 4 FINISHING METHOD FOR SANTA LUZIA PRODUCTS FINISHING WITH CAULKING 1 3 4 2 1 and 2 - After installation of all mouldings, caulk all mouldings for a better finish.
5 YEARS EXPRESS LIMITED WARRANTY This Express Limited Warranty, (“Limited Warranty”), is given to either (1) the original purchaser or (2) the owner(s) of the property at the time of installation, if different from the original purchaser (collectively hereinafter “Purchaser”), of Santa Luzia Moulding Products (hereinafter “Products”), installed on structures permanently located in the United States. 1. LIMITED WARRANTY COVERAGE.
paints, stains and/or coatings; (J) growth of mold, mildew, fungi, bacteria, or any organism on any surface of the Product(s) (whether on the exposed or unexposed surfaces); (K) improper maintenance, use or incompatible accessories; or other products that cause a Product defect or failure to occur; (L) animal (including pet urine), wildlife, and termite damage; (M) water damage, including but not limited to water damage caused by flooding, standing water (water that remains on the moulding longer than 5 min
Architects Raquel Ramos and Eduardo Shmidt - Image: Rô Reitz. PREMIUM SUSTAINABLE MOULDINGS Santa Luzia USA Inc EIN: 35-2514357 Miami Ironside 7636 NE 4th Ct, #106 Miami, FL - ZIP 33138 - USA Phone: +1 (305) 438-7955 @santaluziamouldings /santaluziamouldings /santaluziamouldings www.santaluziamouldings.com customersupport@santaluziamouldings.