Installation Guide

8
TC-950 & TC-950-WPA
July 2017
CHAPTER 3 - INSTALLATION AND CALIBRATION
Before installation, carefully read the manual. Any unauthorized modifications and/or changes to any parts
and/or components of the tire machine, may cause damage to the machine.
Installation and assembly personnel should have the specific electrical knowledge.
Operators must be trained and authorized to operate the machine.
Before installation, carefully read the equipment list. If there are any questions, please contact the dealer or
representative.
To ensure the success of the installation, please have the following common tools:
Adjustable Wrenches, Socket Wrenches, Hex Keys, Pliers, Screw Driver & Hammer & multi-purpose Meter.
3.1 UNPACKING
3.1.1 According to the de-package instructions on the package box, detach the box and remove the
package material to check for machine damage and if all spare parts are included.
3.1.2 Keep the package material far away from the working site and dispose of properly.
3.2 INSTALLATION
3.2.1 After un-packaging the package carton, take out Accessory Boxes (Fig. 4-1), Bead Breaking Arm
(Fig 4-5) and Column Assembly (Fig. 4-2). Ensure to position the machine according to the information
noted in Chapter 1.4.ENVIRONMENT REQUIREMENT. Remove mounting bolts, lock washers & flat
washers from Column Base (Fig. 4-4) in preparation to install Column to Base (Fig. 5).
3.2.2 Place the Column on Base with the direction of the warning label facing forward. Align the Column
holes to the Base holes and mount with bolts, lock washers & flat washers, noted in the previous
Chapter.
3.2.1 Using a Torque Wrench, tighten bolts to 52 ft.-lbs. (Fig. 5.) to secure Column to Base.
Fig. 4 Fig. 5