Installation Guide

2
Jun. 2018
M-1000C
READ ENTIRE MANUAL TO COMPLY WITH ALL SAFETY AND SERVICE
PRECAUTIONS. DEATH, PERSONAL INJURY AND/OR PROPERTY DAMAGE MAY
OCCUR UNLESS INSTRUCTIONS ARE FOLLOWED CAREFULLY.
UNPACKING AND SET-UP
Open crate, then remove ramp and shipping boards.
Carefully remove lift from crate. (Note: Lift is specifically shipped upside-down.)
Carefully, flip lift over to normal upright orientation.
Install tie-down eyelets to front corners of platform.
Locate & connect foot-operated air valve to 100 psi air supply.
The lift may be damaged and/or personal injury may result if the pressure
exceeds the maximum 100 psi rating.
Stand clear of lift platform, and depress the UP side of foot valve to raise platform.
To lower platform, lift safety latch bar from safety latches and lower to next position
or to floor. (Note: The latch bar can also be held in position to fully lower lift by
clipping to underside of platform.)
Install approach ramp by inserting into holes at rear end of platform.
Install stabilization bar by removing the cap at one end, then insert bar through
square hole in base of scissor mechanism. Secure with nut & bolt hardware and
reinstall cap.
Lift Platform
Drop Out Panel
(Rear Wheel Access)