Installation Guide
2
Jun. 2018
M-1000C
READ ENTIRE MANUAL TO COMPLY WITH ALL SAFETY AND SERVICE
PRECAUTIONS. DEATH, PERSONAL INJURY AND/OR PROPERTY DAMAGE MAY
OCCUR UNLESS INSTRUCTIONS ARE FOLLOWED CAREFULLY.
UNPACKING AND SET-UP
• Open crate, then remove ramp and shipping boards.
• Carefully remove lift from crate. (Note: Lift is specifically shipped upside-down.)
• Carefully, flip lift over to normal upright orientation.
• Install tie-down eyelets to front corners of platform.
• Locate & connect foot-operated air valve to 100 psi air supply.
The lift may be damaged and/or personal injury may result if the pressure
exceeds the maximum 100 psi rating.
• Stand clear of lift platform, and depress the UP side of foot valve to raise platform.
• To lower platform, lift safety latch bar from safety latches and lower to next position
or to floor. (Note: The latch bar can also be held in position to fully lower lift by
clipping to underside of platform.)
• Install approach ramp by inserting into holes at rear end of platform.
• Install stabilization bar by removing the cap at one end, then insert bar through
square hole in base of scissor mechanism. Secure with nut & bolt hardware and
reinstall cap.
Lift Platform
Drop Out Panel
(Rear Wheel Access)