Installation Guide
14
TP11KC-DX
Jun 2017
Fig. 7c
9. Anchoring Off Side Column
A. Using a level, check the alignment and plumbness of
the entire structure. Plumb the off side column both
side to side and front to back.
B. The base of the column may vary from the preliminary
layout, as it is more important that the column be
perpendicular to the floor and parallel to the other
column.
C. Install the anchor bolts and shim the base as described
in Step #6
10. Equalization Cable Routing
A. The carriages should be resting on the same column latches for proper equalization. Ensure to measure the
height above the baseplate to each carriage. The measurement should be within 3/8” of each other.
Fig. 8a Fig. 8b