Installation Guide

15
TP11KC-DX
Jun 2017
B. Using the diagrams, rout the equalization cables according to Fig. 8a, 8b, 8c from carriage to carriage
through the cable rollers. Secure to carriages using Nylon Hex Nuts & Washers. Ensure that cables are not
crossed together. Take out slack but DO NOT TIGHTEN CABLES AT THIS TIME.
C. After equalizations cables are routed and connected to carriages, take out the slack in both cables by
turning down the nuts on top of each carriage top. Use vise grips to hold the cable end, but be very careful
not to damage the threads.
NOTE: CARRIAGES MUST REMAIN AT THE SAME COLUMN LOCK HEIGHT POSITION WHILE CABLES ARE
BEING TIGHTENED. FAILURE TO DO WILL CAUSE THE CARRIAGES SAFETY LATCHES TO BE OUT OF SYNC.
D. Alternately tighten the cable nuts at both carriages until the cables are tightened. The correct tension in
the cables are indicated by being able to pull the cables together with approximately 15 lbs. effort at
midpoint in the column. If the cables are installed correctly, both carriages will raise together.
Fig. 8c - Cable Routing