Manual

Manual 0-2251 3-1 INSTALLATION PROCEDURES
SECTION 3: INSTALLATION PROCEDURES
3.1 UNPACKING THE SYSTEM
Figure 3-A Unpacking the System
The power supply is skid-mounted and protected with a
carton and padding material to prevent damage during
shipment. The power supply, work cable, torch, and torch
leads are factory-assembled and packaged together. Also
packed with the system are:
Spare parts kit for the torch
Coolant de-ionizing cartridge
Air filter assembly (for air systems)
1. Remove all packing material.
2. Locate the packing list. Use the list to identify and
account for each item.
3. Inspect each item for possible shipping damage. If
damage is evident, contact your distributor before
proceeding with system installation.
The unit is mounted on the skid with two brackets. To
remove the unit from the skid, refer to Figure 3-A and:
4. Remove the six bolts connecting the brackets to the
base of the unit.
5. Roll the unit off the skid backwards (rear wheels first).
A-00953
Three Bolts
(Each Side)
Shipping Brackets
Shipping Pallet