Owner manual

Gas Heater (TEGH)
Conversion Procedure
Doc. No.
SB-02A
Rev. (Rev. Date)
Apr. 8, 2011
Written by:
Eng. Approval:
Page 1 of 2
Mfg. Approval:
CONVERSION KIT PARTS INCLUDED
P/N CKNG-TEGH, NG Conversion Kit (LP to NG)
OR
P/N CKLP-TEGH, LP Conversion Kit (NG to LP)
Part No. Part Description Qty. Part Picture Part No. Part Description Qty. Part Picture
15108-36
Orifice #36 DMS,
Main burner, NG
1 15108-50
Orifice #50 DMS,
Main burner, LP
1
15115
Orifice, rate screw,
blank stud
1
15114
Orifice, rate screw
1.7mm # 51
1
13349
Orifice (0.018),
Pilot burner, NG
1
13348
Orifice (0.012),
Pilot burner, LP
1
18351 Conversion Label 1 18351 Conversion Label 1
TOOLS REQUIRED
½” and
7
/
16
” Wrench Long nose pliers Flat screwdriver
PROCEDURE
1) Shut-OFF the gas supply and then open the component
access door.
2) Remove the main burner orifice from the brass elbow using a ½”
wrench. Replace the main burner orifice accordingly (#36 DMS
for NG or #50 DMS for LP).
3) Remove the tubing from the pilot burner with a
7
/
16
” open
wrench. Remove the pilot burner orifice and insert the appropriate
orifice in the same direction as shown on picture 3, (0.018
for NG or 0.012 for LP). Screw the tubing back into the pilot
burner.
1
)
Label
2)
3
)
To
p
side in first.
Access Door

Summary of content (2 pages)