Specifications

Chapter 2: Setting Up 15
2.1 Rack Mounting
After installing the necessary components, the
Transport GT20 can be mounted in a rack using the supplied
rack mounting kit.
Rack mounting kit
Sliding Rails x 2:
Sliding Brackets x 4 (Front x 2, Rear x 2)
Mounting Ears x 2
Screws Kit x 1
Mounting Brackets x 4
2.1.1 Installing the Server in a Rack
Follow these instructions to mount the GT20 into an industry
standard 19" rack.
NOTE: Before mounting the Transport GT20 in a rack, ensure
that all internal components have been installed and that the
unit has been fully tested. Maintenance can be performed on
the unit while in a rack but it is preferable to install the device
in a fully operational condition.
Screws List (including screws for SMDC)
A: Flat 6#-32 x4~x16
B: B-type 6#-32 x4
C: M4-4L x8
D: M4-5L x4
E: M4-8L x8
F: M4-15L x2
G: 13.5mm stand-off x1
A
B
C
D
E
F
G