User's Manual

4. If using cable clamps: Thread a clamp into
each hole used. Run cables (except power)
through clamps leaving about 30cm (1ft) of
excess cable on the other side. Tighten clamps.
If using conduit: Attach conduit to the cable
tray and run cables to the controller.
5. Mount the cable tray/mounting bracket
assembly to a vertical surface, ceiling, or shelf.
Vertical Surface
WARNING! Only mount the cable tray
face down, or to the left as shown.
The wall must support at least 29.2kg
(64.6 lbs). Use appropriate anchors.
Mounting holes must align with two
wall studs. If not, use the extension
bracket supplied.
Ceiling
Mount the assembly directly to cement, or first
mount plywood larger than the surface area of
the bracket to a ceiling structure above the
ceiling, then mount the cable tray/mounting
bracket assembly to the plywood.
WARNING! The ceiling must support
at least 29.2kg (64.6 lbs).
Shelf
6. Mount the controller partially onto the mounting
bracket and connect cables.
a. Attach connectors supplied to the cables.
b. Route cables through the rectangular
opening in the controller housing.
c. Referring to the diagrams on pages 4 and 5,
plug the cables into the appropriate color-
coded circuit board connectors:
7. Connect ac power (see page 12).
8. Slide the controller completely onto the cable
tray/mounting bracket assembly and secure
using the two ΒΌ-turn fasteners.
9. Re-attach the cover to the top of the controller
and secure using the six captive screws.
AMS-9040 CONTROLLER 8200-0367-02, REV. D
INSTALLATION AND SERVICE GUIDE
11 of 22