ULTRA MAX PHASING TOOL 8000-2579-49 REV. B
USER GUIDE
5 of 9
8000-2579-49
5. Select Open to open the console window.
Below is an example of the PuTTY initialization
screen.
Figure 5. PuTTY Configuration
6. Note: To query the PuTTY, select ? as shown
below.
The Console Menu displays again. See image
below.
7. The PuTTY screen launches. Figure 6 shows
an example of the PuTTY input screen.
Figure 6. Example of PuTTY screen
8. To display the phase delta, press enter, and
then type 1 in the command line. This shows if
the signal from the system being phased is
leading or lagging from the reference system.
The value is displayed in microseconds and
milliseconds for convenience.
Note: Refer to the appendix for a list of PuTTY
commands.
Adjusting the Phase
1. Open the standard configurator (eg. ADS4,
UltraPost) for the system which is being
phased. Use the phase adjustment slider on
the configurator to adjust the phase by the
amount indicated on the phase delta display.
Note: For Legacy equipment see Phasing
steps for Legacy M4K controller in the
Appendix.
2. Check the phase delta again by typing “d” on
the command line of the PuTTY interface. If
the delta in microseconds is close to zero
(within plus or minus 50µS), then the phasing
is complete. If not, adjust the phase again and
recheck.
3. Repeat for each system which requires
phasing.