User's Manual

Table Of Contents
4-2 8000-2803-01, Rev. 1/A8000-2803-01, Rev. 1/A8000-2803-01, Rev. 1/A8000-2803-01, Rev. 1/A Installation
Installation Checklist
This check list provides an overview of the steps
required to install C•CURE Watch components.
Since order of installation can vary somewhat
based on site requirements, the check list
establishes guidelines concerning the relative order
in which they may be completed.
Site planning should be completed before
beginning the installation.
WARNING: Do not install this product in
hazardous areas where highly
combustible or explosive products are
stored or used.
Phase 1: Hardware Installation
G Install cable runs.
Cable requirements overview, page x
RF passage antenna cabling, page x
RF controller cabling, page x
G Install RF antennas, RF controllers, door
hardware (door latch relay, door sense
monitor, request to exit, passive infrared
detector).
G Install RF controller, page x.
Mount RF controller enclosure, page x
Connect power supply cables, page x
Connect RF antenna cables, page x
Connect inputs and outputs, page x
Connect communications cables, page x
Connect synchronization cables, page x
G Connect to host panel (apC or I-Star), refer to
installation instructions supplied with panel.
G Connect power to RF controller, page x.
Phase 2: System Activation and
Test
All steps in Phase 1 must be completed before
beginning Phase 2. Complete these steps in the
order presented.
G Inspect the installation, page x.
G Activate the system, page x.
Tune RF passage antennas, page x
Configure C•CURE 800 software, page x
G Verify system operation, page x.
Install Cable Runs
Tag all wire bundles and run cables.
Pull a little extra wire to place less strain at the
connection points (excess wire can be coiled into
the wall space).
Required cable runs include:
RF controller to door/portal being protected.
Host panel to RF controller.
RF controller to RF controller (for
synchronization).
Power to RF controller.
Refer to Chapter 3: Planning for more specific
cable specifications.
Install RF Passage
Antennas
Installing RF passage antennas includes the
following:
Prepare for installation
Install brackets and mount antennas
Install wire loop (for antenna pairs)
Connect RF controller cables
Install finishing hardware
Prepare for Installation
The following items are required before installation
begins:
Site plan indicating model of each RF passage
antenna and its mounting location.
Two cables run between RF antenna mounting
location and RF controller mounting location:
control cable and power cable.
!