User Manual

USER GUIDE
Integrated Panel Installation 1
u-line.com
SAFETY • INSTALLATION & INTEGRATION • OPERATING INSTRUCTIONS • MAINTENANCE • SERVICE
Integrated Panel Installation
1. Fully open door.
2. Starting at corner, pull
gasket away from door.
3. Continue to pull gasket
free from gasket channel.
4. Upon removal, lay gasket down on a flat surface.
5. The panel should be aligned with the outside edge
(opposite the hinge) and high enough to align with the
highest point in the door.
NOTICE
Due to differences in floor construction or
surrounding cabinetry, the panel may not sit
flush with the top of the door.
6. Secure integrated
panel to door using
clamps. A robust
tape may also be
used. U-Line
recommends the
use of bar clamps
to secure the panel
to the door. If using
tape, be certain the
tape will not
damage panel finish
upon removal.
7. Using a 7/64"
(3 mm) drill bit, drill
6 pilot holes into
the wood panel 1/2"
(12 mm) deep using
the holes in the
door frame as a
guide.
NOTICE
It is important to ensure that all drilled holes are
drilled to the correct depth in order to avoid
splits in the wood when hardwood is installed.
8. Locate 6 of the #6x 1-1/2" (38 mm) screws provided
with your unit.
9. Using a Phillips screwdriver, place one screw into each
of the 6 pilot holes and screw down. Do not overtighten
screws.
Align Panel
Against
Door Edge
First
Align Top Of Panel With Highest Point Of Door
Door
Panel
Wood
Panel
Door/Drawer
Bar
Clamp
Bar
Clamp