QUICK START GUIDE Nugget Ice Machine • ADA, 1 & 3 Class 30635 30635 Rev_C Rev_A
USER GUIDE QUICK START GUIDE u-line.com u-line.com WELCOME TO U-LINE Congratulations on your U-Line purchase. Your product comes from a company with over five decades of premium modular ice making, refrigeration, and wine preservation experience. U-Line creates products focused on functionality, style, and inspired innovations — paying close attention to even the smallest details. Applications include residential, outdoor, ADA height compliant, marine, and commercial.
QUICK START GUIDE u-line.com This Quick Start Guide covers the basics of installation and general use of your product.
QUICK START GUIDE u-line.com Safety and Warning ! DANGER NOTICE This unit contains R600a (Isobutane) which is a Please read all instructions before installing, flammable hydrocarbon. It is safe for regular operating, or servicing the appliance. use. Do not use sharp objects to expedite defrosting.
QUICK START GUIDE u-line.com Environmental Requirements NOTICE This model is intended for indoor/interior applications only local codes. This unit requires connection to a Electrical installation must observe all state and grounded (three-prong), polarized receptacle and is not to be used in installations that are open/ exposed to natural elements. that has been placed by a qualified electrician.
USER GUIDE QUICK START GUIDE u-line.com Water Hookup ! CAUTION PREPARE PLUMBING Do not use any plastic water supply line. The line The water valve uses a standard 1/4” (6.35 mm) is under pressure at all times. Plastic may crack compression fitting. U-Line recommends using accessory or rupture with age and cause damage to your water hook up kit – part # 80-54674-00. The kit includes home.
QUICK START GUIDE USER GUIDE 1. u-line.com Turn off water supply and disconnect electrical supply to product prior to attempting installation. 2. Remove the back panel. 3. Thread water line through back panel hole (with bushing). 4. Locate water valve inlet and connect to valve. 3 4 5. Turn on water supply and check for leaks. 6. Reinstall back panel.
QUICK START GUIDE QUICK START GUIDE u-line.com u-line.com Drain GRAVITY DRAIN Model numbers including “CL” or “NB” do not include a factory installed drain pump. Normal Proper Drain Model numbers including “CP” or “NP” include a factory installed drain pump.
QUICK START GUIDE QUICK START GUIDE u-line.com u-line.com FACTORY INSTALLED DRAIN PUMP Y-Branch Tailpiece P60 Pump Required If your drain line will run up to a stand pipe, disposal or Air Gap (Optional Hook-Up) spigot assembly, or does not otherwise meet the requirements for a gravity drain, you may have ordered a pre-installed U-Line P60 drain pump. Waste If you need to install a P60 drain pump into your unit, see 6KXW 2ɞ Valve DRAIN PUMP section in the User Manual.
QUICK START GUIDE QUICK START GUIDE u-line.com u-line.com Door Adjustments REVERSING THE DOOR 1. Open door. 1 CLASS AND 3 CLASS DOOR ALIGNMENT AND ADJUSTMENT Align and adjust the door if it is not level or is not sealing 2. Using T-25 Torx bit loosen screw #1 and remove screw properly. If the door is not sealed, the unit may not cool door from unit. Completely remove screw #1 on top properly, or excessive frost or condensation may form in and bottom. #2 on top and bottom hinge.
QUICK START GUIDE QUICK START GUIDE u-line.com u-line.com Door Adjustments 6. Tighten top hinge screws and replace hinge cover. ADA COLLECTION TO REVERSE THE DOOR HINGE COVER Hinge cover included with the literature bag is optional. To install hinge cover: 1. Press hinge cover squarely over hinge. Hinge Cover Remove top hinge and door: 1. Hold door to keep it from falling. DOOR ALIGNMENT AND ADJUSTMENT Align and adjust the door if it is not level or is not sealing 2.
QUICK START GUIDE QUICK START GUIDE u-line.com u-line.com Install top hinge and door: 4. Remove three screws from hinge holes on the opposite side. Reinstall into holes where the hinge was 1. Install hinge with longer straight edge aligned to removed. outside edge of cabinet. Do not tighten. Remove bottom hinge: 1. Remove bottom hinge from cabinet using a T-10 TORX screw driver to remove three screws. 2. Lift the door on to the bottom hinge. 3.
QUICK START GUIDE QUICK START GUIDE u-line.com u-line.com General Installation INSTALLATION 1. Plug in the power/electrical cord. LEVELING INFORMATION 1. Use a level to 2. Gently push the unit into position. Be careful not to confirm the unit is entangle the cord or water and drain lines, if level. Level should applicable. be placed along top edge and side edge 3. Re-check the leveling, from front to back and side to as shown. side. Make any necessary adjustments.
QUICK START GUIDE QUICK START GUIDE u-line.com u-line.com Integrated Panel Installation It is important to ensure that all drilled holes are INTEGRATED MODELS ONLY splits in the wood when hardwood is installed. 1. Fully open door. 8. Locate 6 of the #6x 1-1/2" (38 mm) screws provided drilled to the correct depth in order to avoid with your unit. 2. Starting at corner, pull gasket away from door. 9. Using a Phillips screwdriver, place one screw into each of the 6 pilot holes and screw down.
QUICK START GUIDE USER GUIDE u-line.com Control Operation 3 CLASS CONTROL FUNCTION GUIDE FUNCTION COMMAND NOTES ON/OFF Press Unit will immediately turn On or OFF Adjust ice density See “Ice” section Adjust light color Enable Sabbath Mode and release While holding press and release to scroll through lighting options Press and hold for 5 seconds and release Option Open Door 00 01 02 White Blue White The oF / oC symbol will flash briefly after 5 seconds.
USER GUIDE QUICK START GUIDE u-line.com u-line.com Control Operation 1 CLASS & ADA COLLECTION CONTROL FUNCTION GUIDE FUNCTION COMMAND NOTES ON/OFF Press Unit will immediately turn On or OFF Adjust ice density See “Ice” section Enable Sabbath Mode Press and release and hold for 5 seconds and release The oF / oC symbol will flash briefly after 5 seconds.
QUICK START GUIDE USER GUIDE Ice Under normal conditions cleaning should be done when the display shows The Nugget Ice Machine produces cylindrical bits of u-line.com CL. You may initiate a cleaning cycle at any time by pressing and compressed ice approximately 3/4” x 1/2”. holding the clean button for 10 seconds. 0 1 will Ice is produced until the machine senses the bin is full.
QUICK START GUIDE u-line.com 6. Cl When 05 appears in the display, 3 soft tones will sound, indicating the cleaning phase is complete a. Remove and discard water filter if applicable by rotating 1⁄4 turn counterclockwise. 1. Press and Hold a. b. Use the remaining cleaning solution to wipe the for 10 seconds 0 1 will appear in the display manifold and surrounding area. Rinse with clean potable water. b. Remove access shield c. Remove all ice in bin d.
U-Line Corporation (U-Line) Limited Warranty One Year Limited Warranty For one year from the date of original purchase, this warranty covers all parts and labor to repair or replace any part of the product that proves to be defective in materials or workmanship. For products installed and used for normal residential use, material cosmetic defects are included in this warranty, with coverage limited to 60 days from the date of original purchase.