Technical data

PD_OpManPS-4_05_us.fm
page 34 PacDrive PS-4 / PD-8 ELAU AG
5 Maintenance
Hard-copy for correction
Fig. 5-4: Wire the PS-4/
connection cable PS-4/PD-8 and fix the strain relief on the cable
duct while the cable is relieved
.
Insert the prefabricated SERCOS cable into the outlet and snap
it on. Fix the strain relief on the cable duct while the cable is
relieved
.
If more PD-8s are connected, connect prefabricated "PD-8/PD-
8" connection cable with the power in/out connections and the
next SERCOS cable with SERCOS in/out as described above.
CAUTION!
Penetrating liquid due to inexpert installation of cable ducts or
missing blind plugs!
Damage to electrical parts!
Check if the cable ducts are tight.
Immediately replace missing or defective blind plugs on unused
cable ducts. Do not run the PD-8 without having fixed the blind
plugs and checked if they are tight.
Do not run the PD-8 while the cover is open. Before starting the
plant, close the cover and check if it is tight.
See also "Technical Data" on page 47.
SCL_Ansch_us.fh8
SERCOS connection (SCL)
power supply connection
jumper for termination
SERCOS cable cable duct
dummy plug
cap nut
fuse