Tus neeg siv phau ntawv

System Setting
During normal operation, if Li-LV LFP Battery Module are installed correctly, the
inverter and battery will start communication immediately, then begin to process power
commands. See the inverter manual for further configuration instructions.
Warning: Do not operate Li-LV LFP Battery Module unless all covers are in place.
Warning: Do not disconnect anything from or add anything to Li-LV LFP Battery
Module.
Caution: Do not try to communicate with Li-LV LFP Battery Module using third party
tools or diagnostics Li-LV LFP Battery Module and the inverter.
Caution: Do not lean on, stack anything on top of, or hang anything from Li-LV LFP
Battery Module or the conduit.
Keep the top edge of Li-LV LFP Battery Module clear of articles to maintain optimal
airflow.
To clean Li-LV LFP Battery Module, use a soft, lint-free cloth. The cloth can be
dampened with only water if needed. It should not be dripping.
Caution: Do not use cleaning solvents to clean Li-LV LFP Battery Module.
*Wattsonic reserves the right to modify the technical datasheet and apperance of the
product in the user manual without prior advice to the users.
NORMAL OPERATION
LI-LV LFP BATTERY MODULE CARE
Li-LV LFP Battery Module | USER MANUAL
11
Wuxi Wattsonic Energy Technology Co., Ltd
Address: No. 200 Linghu Road, Xinwu District,
Wuxi 214100,Jiangsu Province, China
Website: www.wattsonic.com
Service Mail: service@wattsonic.com
CHINA (HQ)
Dec 2022