User's Manual Part 1

CL1TC-4 400W DVB-H Transmitter Installation
Product Manual, Rev. 1 31
4.5.2 Electrical Safety
All transmit
ter equipment, electrical power switches and circuit breakers must be
turned off during installation.
Ensure that the Mains AC power cable connecting the main circuit breaker to the
service panel is the last cable connected during installation.
Ensure that the transmitter main circuit breaker and all PDU circuit breakers are
turned off prior to working on internal transmitter parts or connecting cables.
4.5.3 Cabinet Wiring
All cabinet components
are pre-wired to the cabinet breaker panels and cabinet receptacles.
In this case, only the cabinet main circuit breaker needs to be connected to an external AC
power source.
4.5.3.1 Cabinet Grounding
NOTE:
Please refer to the cabinet vendor’s drawings for the grounding location on the
cabinet.
4.5.3.2 Mains AC Power Cable
NOTE:
Please refer to the cabinet vendor’s drawings for the Main AC connection point on
the cabinet.
WARNING
THE CABINET MUST BE CONNECTED TO THE
BUILDING/SITE MAIN GROUND TERMINAL
DANGER
BEFORE YOU CONNECT THE MAINS AC POWER CABLE
TO THE CABINET, DISCONNECT IT FROM THE
BUILDING DISTRIBUTION PANEL