User's Manual

8
7. Remove the wire (in the irrigation clock)
from the Valve Station #2 terminal and butt
connect it to the WHITE wire with a RED
STRIPE labeled V2/V8 and crimp it so its
attached securely.
8. Identify the PINK wire labeled C2/C8 from
the “Clock Bundle” and attach that wire
in the irrigation clock’s Valve Station #2
terminal where you removed the wire in step
7 above.
9. Repeat steps 5 thru 8 above for all valve
station wires using the labels on the wires
to identify the proper station and valve
wires (Refer to the Wire Reference Guide to
the right for the proper wire connections).
This guide is also provided as a convenient
sticker for inside the irrigation clock for easy
reference.
10. If you identify that the irrigation clock has a
Pump Relay and/or Master Valve proceed to
step 11. If not proceed to step 13.
Installing the Base Station
WIRING A SINGLE BASE STATION CONTINUED