User's Manual

34
Take all tine sleeves, be sure the zone number is written on the
label and bundle them together with a wire tie and attach to the
irrigation clock, Base Station or to a structure nearby.
Make sure all zones are being received by the Base Station and
are communicating (use [View Sensors] page to do this).
Make sure that the Base Station is set to “Auto”.
Make sure the irrigation clock is set to “Auto”.
Make sure all Wetness Levels are set.
It is recommended that a Common Sensor assigned to all zones.
Run through all zones with the irrigation clock to confirm proper
operation and that all zones are working (you may have to set the
UgMO Base Station to “Bypass” if soil conditions are wet because
UgMO may not allow watering. (See page 15). On the front face
of the Base Station the “Watering Requested” and “Watering Al-
lowed” LED’s should light-up with each zone.
Make sure sensor locations are recorded on the Sensor Location
Reference Guide and guide is placed inside the clock.
Clean up entire site.
COMPLETION CHECKLIST
IMPORTANT NOTE: CONFIRM ZONE LOCATION
When testing each zone on the irrigation clock to confirm that it is running properly, check that the appropriate zone
on the Base Station is turning ON. The main display will flash “ON” in the correct zone assignment.
If a different zone turns on, check the zone wiring to correct the issue.
Completing the Installation