Instructions / Assembly

2LT CEILING LIGHT
ASSEMBLY/INSTALLATION INSTRUCTIONS
branch circuit conductor.
shock.
All electrical connections must be in accordance with local and National Electrical Code (N.E.C.)
standards. If you are unfamiliar with proper electrical wiring connections obtain the services of a
referencing the illustrations on the installation instructions.
CAUTION
GENERAL
ASSEMBLY AND INSTALLATION
ASSEMBLY AND INSTALLATION
(CONT.)
Turn off the power at fuse or circuit breaker.
Turn on the power at fuse or circuit breaker.
IF IN DOUBT ABOUT ELECTRICAL INSTALLATION,
CONSULT A LICENSED ELECTRICIAN.
Phillips screwdriver.
TOOLS REQUIRED
1. Gently take all parts out of the package, lay them on a smooth surface, unscrew the BALL NUT.Attach
the CROSS BAR to the JUNCTION BOX using JUNCTION BOX SCREWS.
2. Make wire connections with WIRE CONNECTORS:
A - Connect the black wire from Fixture to the black supply wire.
B- Connect the white wire from Fixture to the white supply wire.
it to the supply ground wire with a WIRE CONNECTOR. Carefully tuck wires back into the JUNCTION BOX.
3. Attach the FIXTURE to the CROSS BAR through SCREW HOLE as shown, and secure it with BALL NUT.
4. Install BULBS(not included). See relamping label at socket area or packaging for maximum allowed wattage.
Please read carefully and save these instructions, as you may need them at a later date.

Summary of content (1 pages)