Instructions
10B2. The rst run wizard First use of your Ultimaker Original
4. In the next conguration steps we want to
do some check ups on your Ultimaker Original.
Make sure before doing these checks you have:
- Connected the usb cable
- The printhead is in the middle of the frame [1]
- The build plate has some distance from the
nozzle, minimal 3 cm. [2]
NOTE: with the Heated bed the build plate might
look dierent. the checks are still the same.
5. Please select the [Run Checks] function.
Now Cura connects with the electronics and
tests some of the internal communication.
Cura will also perform a temperature check to
see if it functions correctly
6. After the temperature check has nished Cura
will check your end stops. End-stops determine
the maximum motion size,
Make sure that you move the printhead in the
direction of every indicated end stop.
7. When the wizard asks you to check on the
right front switch (x axis) gently move the print
head in this direction till you here a click and
Cura gives you the next command.
[1]
[2]
NOTE: Some steps during the endstop checks may be dierent if you have an Ultima-
ker Original+
