Install Instructions

Insulating Above Heated Areas
Insulating Above Unheated
and Exposed Areas
Sample Layouts: Ultra-Fin
MODULATING 10-140°F
Sample Layouts: Ultra-Fin
HIGH TEMP 140°-180°F
Ultra-Fin SideKey
QUICK-CALC for Ultra-Fin HIGH TEMP:
SQ FT X 0.3
=
# FIN PAIRS
QUICK-CALC for Ultra-Fin MODULATING:
SQ FT X 0.5
=
# FIN PAIRS
+
NOTE
+
Care must be taken to ensure R-12 fiberglass insulation
does not ‘fluff up more than 3.5" and R-20 fiberglass
insulation does notfluff upmore than 5.5". The Ultra-Fin
System will not function properly if the air flow below the
Ultra-Fins is blocked.
+
NOTE
+
For all Ultra-Fin installations, ensure the insulation rests
flush with the bottom of the joists, and that a minimum
2" air space is always maintained between the Ultra-Fins
and the insulation.
Refer to the insulation diagrams in this section to confirm
that you have allowed sufficient air space.
INSULATION OVER HEATED AREA_10" JOIST
3
1/2
"
3"
SUBFLOOR SHEATHING
GWB CEILING
ULTRA-FIN
R-12 FIBERGLASS INSULATION
3"
HOLE LOCATION OVER EXPOSED AREA _10" JOIST
R-20 FIBERGLASS INSULATION
SUBFLOOR SHEATHING
GWB CEILING
ULTRA-FIN
R-8 REFLECTIVE INSULATION
2"5
1/2
" 2"
HOLE LOCATION OVER UNHEATED AREA_10" JOIST
R-20 FIBERGLASS INSULATION
SUBFLOOR SHEATHING
GWB CEILING
ULTRA-FIN
2"5
1/2
" 2"
+ IMPORTANT NOTE +
Building codes prohibit you from drilling in certain parts of
joist members. Before you drill, refer to Drilling Section in
this manual for guidelines on where you are permitted to
drill joists. Incorrect drilling may result in structural failure
of joist members. Also check with your appropriate local
building authority.
TUBING SPACING_16" JOIST SPACING
15"30" 15"30"
TUBING SPACING_16" JOIST SPACING
12"18" 12"18"
TUBING SPACING _19" JOIST SPACING
12"24" 12"24"
TUBING SPACING _19" JOIST SPACING
12"14" 14" 12"14" 14"
TUBING SPACING _12" JOIST SPACING
12"22" 12"22"
TUBING SPACING_12" JOIST SPACING
15"30" 15"30"
R-12 fiberglass insulation
Spray foam or styrofoam insulation R-20 fiberglass with vapor barrier
Ultra-fins installed with SideKeys
In new construction above small
crawl spaces, you can choose to
install Ultra-Fin from above, before
the floor sheathing is installed.
Using the SideKey hanger, you can attach the Ultra-Fins and hang
the tubing at the time, following these simple steps:
Lap two Ultra-Fins over
a section of tubing and
insert one SideKey.
1
Fasten the Ultra-Fins
together by twisting
the SideKey 90°.
2
3
TM
SIDE
Done. Finish by
attaching the SideKey
to the joist with a
fastener.