Instructions / Assembly

Issued/Revised:
25
FOOTING DETAIL - IN GROUND
2
1
3
4
2
5
1
CM
0
INCH0
10961114815
7
12 13
4
365
07/17/14
800.458.5872
www.ultraplay.com
069
UPRIGHT
INGROUND
FOOTER
3/8" HEX NUT
(33-01-0002)
3/8" FLAT WASHER
(33-02-0002)
3/8" x 1 1/4"
P.B.H.C.S. w/PATCH
(33-05-0019)
1. Attach Inground Footer to Upright Post using 3/8" x 1 1/4" P.B.H.C.S., 3/8" Flat Washer, and 3/8" Hex Nut. Refer to Footing Table
and Footing Layout page for Hole/Footer location. See Detail 069.
2. Continue assembling unit before pouring concrete. Refer to specific component installation instructions. IMPORTANT:
POURING
CONCRETE IS THE VERY LAST STEP!