Instructions / Assembly
Issued/Revised:
04/26/13
VINE CLIMBER 02-07-5008
uPLAY TODAY
800.458.5872
www.ultraplay.com
2
VINE CLIMBER
(02-07-0032)
GRAB BAR
(02-07-0033)
030
029
UNDERNEATH
040
UNDERNEATH
042
041
VINE CLIMBER EXTENSION POST-SHORT
(02-07-0098)
OR
VINE CLIMBER EXTENSION POST-LONG
(02-07-0097)
036
UNDERNEATH
FOOTER PLATE
(02-07-0046)
UNDERNEATH
FINISHED ASSEMBLY
COMPONENTS SHOWN IN
HIDDEN LINES ARE SOLD SEPARATELY
= INS
TALLATIO
N DETAIL
DECK MOUNTING BRACKET
(02-07-0085)
NOTE: THE VERTICAL POSITION OF THE GRAB BARS MUST BE A MINIMUM OF 38" ABOVE THE DECK. THE CLAMP
POSITION CAN BE ADJUSTED HIGHER TO AVOID INTERFERENCE WITH OTHER CLAMPS.
7. Attach Tube Clamp to Upright using M8 x 25mm B.H.C.S. Bolt and M8 Lock Nut. Once all clamps are on and secure drill Ø1/4"
hole through Clamp and Upright to install Clamp Rivet. See Detail 030. (Do not Install Clamp Rivet until entire unit is assembled)
8. Plumb and level entire assembly before tightening all fasteners. NOTE: Apply Loctite to threads of Bolt to prevent from loosening.
MAINTENANCE PROCEDURE:
Periodically check hardware for tightness, and tighten as necessary. Always check all parts for breakage or wear, and immediately
put equipment out of service until any faulty parts found are repaired or replaced. Also Check all metal parts for rust, paint loss and
touch-up if necessary with paint. Check for welded areas and verify integrity. Check periodically resilient surfacing for appropriate
depth and remove extraneous materials that could cause injury, infection, or disease. Maintain detailed installation, inspection,
maintenance, and repair records for each public-use playground equipment.
TUBE CLAMP
(02-07-0039)