Installation Guide

Issued/Revised:
08/29/13
UP167F CAPTAINS CHAIR (FOOTING)
FitTech
800.458.5872
www.actionfitoutdoors.com 2
ActionFit
UP167I CAPTAINS CHAIR (IN GROUND)
UP167S CAPTAINS CHAIR (SURFACE)
NOTE: Do not overtighten bolts. To overtighten may cause buckling or dimpling of some parts.
NOTE: Read installation instructions thoroughly before starting assembly. Pour concrete only after final assembly is completed.
Bracing material is required during assembly.
NOTE: Assembly and leveling times will be greatly reduced if a transit is used to set location and depth of ground holes.
INSTALLATION INSTRUCTIONS FOR UP167F (FOOTING):
1. Dig holes or drill holes according to Plan View and Elevation View. NOTE: Due to extremes in weather and soil conditions, hole
size may have to be increased to meet local conditions.
2. Fill hole with concrete. Whie the concrete is still soft, yet firm enough to support the Captains Chair, Place (4) Anchor Bolts of the
Captains Chair in position. See Footing Detail. NOTE: Use Captains Chair as a template for Anchor Bolt location, then remove
Captains Chair.
IMPORTANT:
DO NOT MOUNT THE CAPTAINS CHAIR TO THE ANCHOR BOLTS FOR AT LEAST 7 DAYS.
3. After concrete has cured and set for a minimum of 7 days, attach Captains Chair to 3/4" Anchor Bolt using 3/4" Flat Washer
(2" O.D.), 3/4" Lock Washer, and 3/4" Hex Nut. See Footing Assembly Detail.
4. Attach Base Cover to Equipment Post using Base Cover Nut and Base Cover Bolt included with Base Cover. See Base Cover
Detail.
INSTALLATION INSTRUCTIONS FOR UP167I (IN-GROUND):
1. Dig holes or drill holes according to Plan View and Elevation View. NOTE: Due to extremes in weather and soil conditions, hole
size may have to be increased to meet local conditions.
2. Attach the Footbuck Weld Assembly to the Captains Chair using 3/4" Hex Nut, 3/4" Lock Washer, 3/4" Flat Washer (2" O.D.),
3/4" x 2" Hex Head Cap Screw. See In-Ground Assembly Detail.
3. Place Captains Chair into holes making sure it rests on the brick. See In-Ground Detail.
4. Level Captains Chair using sway bracing.
5. Pour concrete according to the Plan View and Elevation View. Allow concrete to cure for a minimum of 7 days.
6. Attach Base Cover to Equipment Post using Base Cover Detail.
INSTALLATION INSTRUCTIONS FOR UP167S (SURFACING):
1. Mark correct location of holes for Wedge Anchors using the Base Plate as a guide.
2. Drill 3/4" x 2 1/2" hole in concrete for Wedge Anchor. See Surface Assembly Detail.
3. Insert Wedge Anchors and secure with 3/4" Flat Washers (2" O.D.), 3/4" Lock Washer, and 3/4" Hex Nut. See Surface Assembly
Detail.
4. Attach Base Cover to Equipment Post using Base Cover Detail.