Instruction manual

Page 22
Preparation for Operation
Preparation for OperationPreparation for Operation
Preparation for Operation
Before switching on, check the following:
Ultra 3 is mounted correctly and is in a ‘safe’ area.
The power supply is correctly installed.
The relays are connected correctly.
Maintenance
MaintenanceMaintenance
Maintenance
There are no user serviceable parts inside Ultra 3, except the mains fuse. If
you experience any problems with the unit, then please contact Pulsar
Process Measurement for advice.
Important Information
Please note that the onboard Lithium battery, mounted to the
processor PCB, is not user serviceable.
To clean the equipment, wipe with a damp cloth. Do not use any solvents on
the enclosure.
Important Information
The unique DATEM software comes into operation as soon as power is
applied, and is designed to monitor a moving level or target with the
transducer in a fixed position.
If, after any period of use, it should become necessary to move the
transducer, for any reason, from its original operating position, switch off
the Ultra 3, before proceeding, in order to prevent any undesirable updates
to the DATEM trace. If after moving the transducer the reading is not as
expected please refer to Chapter 9 Troubleshooting .