Service manual
Groundsmaster 3280−D/3320Page 9 − 6P.T.O. System
P.T.O. Drive Shaft Cross and Bearing Service
1. Remove P.T.O. drive shaft from vehicle (see P.T.O.
Drive Shaft Removal in this section).
2. Remove snap rings that secure bearings in yokes.
IMPORTANT: Yokes must be supported when re-
moving and installing bearings to prevent damage.
3. Use a press to remove cross and bearings from
yokes. Thoroughly clean drive shaft yokes.
4. To install new cross and bearings:
A. Apply a coating of grease to bearing bores to end
yoke and shaft yoke.
B. Press one bearing partially into yoke.
C. Insert cross into yoke and bearing.
D. Hold cross in alignment and press bearing in until
it hits the yoke.
E. Install snap ring into yoke groove to secure instal-
led bearing.
F. Place second bearing into yoke bore and onto
cross shaft. Press bearing into yoke and secure with
snap ring.
G. Repeat procedure for other yoke.
H. Grease cross until grease comes out of all four (4)
cups.
5. Make sure that assembled joint moves without bind-
ing. Slight binding can usually be eliminated by lightly
rapping the yoke lugs with a soft faced hammer. If bind-
ing continues, disassemble joint to identify source of
binding.
6. Reinstall drive shaft to vehicle (see P.T.O. Drive
Shaft Installation in this section).
1. End yoke
2. Cross and bearing kit
3. Snap ring (4 used)
4. Shaft yoke
Figure 4
1
2
3
4
3