Specifications

Appendix E Non-Chassis Field Replaceable Units (FRUs) E-5
5. Power on the Enterprise system.
See the power on instructions in Chapter 11 “Powering Off and On.”
E.2.3 Universal System Cabinet Power Sequencer
E.2.3.1 Removing the Power Sequencer
1. Completely power off the Enterprise system.
See the power off instructions in Chapter 11 “Powering Off and On.”
2. Remove the power cord assembly from the back of the power sequencer.
See Section E.2.2 “AC Power Cable,” for information on removing the power cord.
3. Remove the side panel closest to the power sequencer.
See Chapter 12 “Preparing for Service,” for information on removing the side panel.
4. Disconnect all the cable assemblies from the front of the power sequencer.
Reach through the space uncovered by the side panel to disconnect these cable
assemblies.
5. Remove the two screws at the top of the power sequencer (
FIGURE E-3).
FIGURE E-3 Replacing the Power Sequencer
6. Remove the two screws at the bottom of the power sequencer.
Screws
Screws