When installing UltraDeck
®
decking, gapping guidelines must be followed to ensure that gaps
between decking and end gaps allow for proper expansion/contraction, drainage, and the
shrinking of treated wood joists that can happen over time.
Note: Changes in length are most significant during the installation process, and should be
accounted for if working in extreme temperatures. A good example would be cutting your planks
during a hot afternoon, letting them sit outside overnight in the cool air and then installing them
the next morning. Chances are, you will notice a certain amount of contraction. The best way to
minimize this problem is to fasten your planks as soon as possible after cutting them.
NAILER BOARDS
Two additional nailer boards will need to be added to the framing material at any
butt joint connection to properly end gap UltraDeck
®
planks. Additional nailer boards
must be installed at all end gaps no matter what installation method used. See
Figure 2. DO NOT use decking pieces shorter than 48" on any decking surface other
than stairs.
PLANK & END GAPPING:
!
TCLIPS
Install two UltraDeck
®
T-Clips
to each board at every end gap. The additional nailer
boards must be used to aid in supporting the deck planks and proper T-Clip
placement. See Figure 2. If installing decking in temperatures below 60˚ F, it is
recommended to use UltraClips
.
NATURAL
, RUSTIC
, TRIUMPH
, FUSION
®
&
INSPIRE
For every 16' of plank, allow a ⁄" gap for every 20°F temperature difference be-
tween the time of board installation and the maximum expected temperature
(refer to the end gapping chart, Figure 1). With all fastening methods, make sure to
use two fasteners for attachment of deck boards to each joist.
DEKMOUNT
®
Install DekMount
®
onto each joist by screwing a ⁄" premium screw through side
hole in DekMount
®
. Install deck planks one at a time, from the end of the deck,
working back towards the house or walled structure. Install two pieces of DekMount
®
on either board at butt joints.
SURFACE SCREWING
When using screws through the top side of decking, at each end of the plank, pre-drill
and sink screws at least ¾" away from the edge of the plank to prevent splitting.
DO NOT over-tighten the fasteners. See surface screwing installation on page 11.
A deck board installed as a joining
board at the seams will minimize
the look of end to end contraction by
separating the visual gap.
END GAPPING SOLUTIONS
Figure 1
Fig. 2
T-Clip
/ DekMount
®
Figure 2