Instructions / Assembly
Table Of Contents
1 ASSEMBLY
6
Figure
8
Note: To make it easier to insert
these screws, you may back out the
squaring wedge block screw (turn
knob CCW) at the left end of the
Horizontal Material Bar beforehand
.
Figure 7
6. Insert the Pivot shoulder bolt (M) through the
Horizontal Material Bar and into the hole in the
Vertical Track assembly, just to the right of the
main extrusion (Figure 6). Make certain that the
shoulder of the bolt has been inserted correctly,
and then tighten securely with a 6mm hex key.
7. Insert three (3) M8 x 25 button head screws (L) with flat washers (O) into the remaining three
holes in the Horizontal Material Bar, two on the left side, and one on the right (Figure 7). Do not
completely tighten these screws yet, as they will need to be slightly loose during the squaring
procedure later.
8. With assistance, flip the assembly over so that it is now
face down on the foam packing blocks. Locate and
unpack the three lower leg sections now.
9. Pivot the left leg outward to the right (right
side of machine, facing downward) and
insert the lower left leg section (item #3), to
the main left leg (Figure 8).
Im
p
ortant! Insert this Pivot bolt FIRST.
Figure
6
Hardware bag b










