Instructions / Assembly
Table Of Contents
1 ASSEMBLY
1
♦ Important Notes:
• To assemble the FSC, you will need a clear workspace of approximately 10'x10'.
• All views mentioned for the assembly of the FSC are from the perspective of the
customer facing the standing machine.
• All bolts are inserted from left-to-right, or from front-to-back.
1.1 Unpacking the FSC
Check the exterior of the shipment carton to make sure there is
no visible damage. After unpacking the unit, check to make
sure all the parts listed below are present and undamaged.
1.2 Terminology for Set-Up
The Vertical Track Assembly has been pre-assembled for you.
Familiarize yourself with the main parts of the pre-assembled
unit.
¾ Vertical Track Assembly
– The main rail that the Cutting
Head slides on, including the Clamp mechanism.
¾ Cutting Head – holds the various cutting tools and moves along the Vertical Track
Assembly.
1.3 Contents Included:
9 Partially Pre-Assembled Vertical Track/Clamp Assembly
9 Frame Parts (see Frame Parts list and photo below)
9 Box #1* - Tool Caddy
• Tool Caddy
• 2 Screws and Washers
9 Box #2* - Laser and Bracket Assembly
• M10 bolt and 17mm wrench
9 Box #3 - Blade/Wheel Holders and Stops
• 3 Blade/Wheel Holders
• 2 Production Stops, Left and Right
• 5 Hex Keys (2.5, 3, 4, 5, and 6mm)
9 Box #4 - Frame/Stand Hardware Box (see Chart and Figure on page 3)










