STEP 17 Align the drawer glides on the drawer assembly to the drawer mount glides and carefully slide in. Pull the drawer in and out making sure the glides are pocked together. STEP 18 Place 5/8” Work Surface Board {Q} Into place. Congratulations! The assembly is complete. 2301 Traffic St NE Minneapolis, MN 55413 Workbench Manual Roved 1310 ASSEMBLY INSTRUCTIONS 6’ WORKBENCH Model: 01072 Lt e Y] 800-495-9278 Weekdays: 8:00 a.m. 5:00 p.m.
Thank You for purchasing a high quality workbench from Gecko Products. If you require any assistance with assembly, please contact us foll free at 1-800-495-9278. Monday through Friday 8:00 a.m. to 5:00 p.m. Central Time. Tools Needed * Rubber Mallet or hammer. Assembly Tips * Fully read and understand these instructions before starting assembly. » Group similar parts together. » I the use of a mallet or hammer is required, use a block or cloth to protect the finish.
Flange on bottom STEP 11 Assemble the drawer frames by attaching two Drawer Beams (T) to two 18" Drawer Side Beams (S). Flange on (T) needs to be on the bottom. STEP 12 Attach inner drawer glides to the sides of the drawer side beams by pushing in and back. STEP 13 Place 3/8" Drawer Bottom (U) inch drawer frame. L PARTS OVERVIEW stem Description Qty. stem Description Qty.
*NOTE: Part Flange sends to be on top *~ | FIGURE | STEP 1 Assemble the left side of the workbench by attaching two 24™ Beams* (B) to the Front Post (M) and Back Post (L). Be sure to use the 1st & 2nd keyholes on the upper part of the posts. Assemble the right side of the workbench using the same procedure as above. If necessary use a rubber mallet to secure the parts together. Hit the beams as close to the joint as possible to avoid damaging the parts.