Installation Guide
A.
B.
A.
B.
C.
45-Degree Railing
12.12.
13.13.
14.14.
Aach posts to decking frame. Square to straight side of rim joist
and level. Follow procedures 2-4 to install posts and decking.
Determine the angle of the top rail
A. Lay a top rail centered on top of the two posts and mark angle
(see railing orientaon) and cut.
B. Mark and cut the boom rail the same way, making sure to lay
the 4-inch leg on the posts.
A. Place boom rail on blocks that are cut to the toe sweep height
desired (no less than 2-inches nor greater than 4-inches) – 4-inch leg
lying on blocks.
B. Place baluster with 45-degree cut side against the post posioned
at the 45-degree corner and sit on the boom rail. Aach it to the
post using procedure #5C.
C. Place a regular baluster against the diagonal baluster, sing on
boom rail and aach with three, 2-1/4-inch, #7 stainless steel trim
head screws, evenly spaced top to boom.
Finish with steps #5D through #11 – with the excepon of the post
baluster that has been installed already in this 45-degree secon
(step #14).
45 Degree Railing
QUESTIONS? CALL 800.951.5117
www.ChoiceDek.com
10