Instructions / Assembly

Installation on Space Sheathing
Wall installations
New Construction: Walls
Install metal flashing above window and door openings, and caulk around
openings.
Installing metal flashing over all inside corners is also recommended.
Make sure all door and window casings are in place before starting
shingling.
Exposure on wall shingles can be much greater than roof shingles as walls
are less exposed to weather conditions.
For quantity of shingles required, refer to the "Calculating the right
quantity" section.
First row should always be two shingles thick and protrude at least 2.5 cm
(1 in.) from top of foundation
Courtesy of :