Instructions / Assembly
Installation on Space Sheathing
Wall installations
New Construction: Walls
• Install metal flashing above window and door openings, and caulk around
openings.
• Installing metal flashing over all inside corners is also recommended.
• Make sure all door and window casings are in place before starting
shingling.
• Exposure on wall shingles can be much greater than roof shingles as walls
are less exposed to weather conditions.
• For quantity of shingles required, refer to the "Calculating the right
quantity" section.
• First row should always be two shingles thick and protrude at least 2.5 cm
(1 in.) from top of foundation
Courtesy of :










