Instructions / Assembly
Installation on Space Sheathing
Hip and ridge units
• Using prefabricated hip and ridge units is faster as they come
with mitered joints and concealed nailing.
• For hip roofs, install hip units before ridge units.
• Use same exposure as for shingles when installing hip and
ridge units.
• Install double starter units over the first course of shingles at
low end of each hip.
• Temporarily install a hip unit at the top of the hip.
• Snap chalk lines on each side of the hip along the edges of
both hip units.
• Chalk lines serve as guides for positioning the rest of hip units.
Courtesy of :










