Instructions / Assembly

Installation on Space Sheathing
Hip and ridge units
Using prefabricated hip and ridge units is faster as they come
with mitered joints and concealed nailing.
For hip roofs, install hip units before ridge units.
Use same exposure as for shingles when installing hip and
ridge units.
Install double starter units over the first course of shingles at
low end of each hip.
Temporarily install a hip unit at the top of the hip.
Snap chalk lines on each side of the hip along the edges of
both hip units.
Chalk lines serve as guides for positioning the rest of hip units.
Courtesy of :