Instructions / Assembly

Installation on Space Sheathing
Hip and ridge units (Con’t)
Install ridge units at both ends of the ridge working toward
the centre of the roof.
Create a saddle to cover where both courses meet.
Use two rust resistant nails to install each hip and ridge unit.
Use nails long enough to go 1.5 cm (1/2 in) into the deck.
Applying a 13-kg (30-pound) felt or kraft paper under hip or
ridge units is recommended.
Installing concealed metal hip and ridge flashing is a good
idea for a more lasting roof and underlayment.
Courtesy of :