Instructions / Assembly

Installation on Space Sheathing
Roof valleys
After flashing is installed, shingle away from both sides of the valley.
This way, all shingles adjacent to valleys can be cut using the same
pattern.
Install shingles to within 5 cm to 10 cm (2 in. to 4 in.) on each side of the
centre line of valley.
Never allow joints between shingles to break into a valley: make sure all
joints have a solid shingle beneath and on top of them.
Never lay shingles with the grain parallel with the centre line of a valley.
Shingles should lap at least 18 cm (7 in.) over each side of valley flashing.
Courtesy of :