Instructions / Assembly
[Type here]
1
ARTPOLE PAINTABLE GLASS REINFORCED GYPSUM TILES
INSTALLATION INSTRUCTIONS
Please carefully read the installation instructions before starting the installation to help you attain the desired
results. The instructions are provided as guide as there are multiple effective methods to create a professional
installation. The ARTPOLE tiles are made with glass reinforced gypsum, which is a hard rock material with a
smooth paintable porcelain finish. Each tile measures 23.6”x23.6” and made to European measurements.
Thickness and weight vary depending on the 3D pattern.
WHAT IS A CONTINUOUS PATTERN FLOW?
Panel "flow" is when two panels are set side by side or top to bottom and properly aligned so that the pattern
flows visually from one panel to the next on all four sides. A “seamless” installation is attained when the seam at
the point where two panels come together has been filled with a filler compound, sanded down smooth to blend
the joint line between the two panels and given the final coats of primer.
PANEL LAYOUT CONFIGURATION
It is important to understand that installing a Textures-3D® Artpole panel is not the same as installing ceramic
tiles which have random patterns and there's nothing to match. All our panels have continuous pattern match on
all four sides, but this is only from factory edge to factory edge.
It is recommended that before the installation begins that four panels be removed from their boxes cover and
aligned on the floor to view how the pattern flows on all four sides.
STEP BY STEP INSTALLATION GUIDE
STEP 1. RECEIVING THE SHIPMENT
The panels will be shipped boxed or on a solid wood crate dependent on the number of panels. The crate has
been specifically designed and engineered to make sure that your order arrives undamaged. All shipments will be
delivered by UPS or Fed-Ex if they weigh less than 80lbs and by truck if the weight is higher than 80lbs.
Since the average panel weighs about 11lbs orders of more than seven panels will shipped through freight
transport. Unless otherwise requested we will specify that the delivery truck at destination have a lift and an
advanced call made to set up a window of time for delivery. We recommend that the contractor who will be
handling the installation be there to receive the shipment as the drivers will usually require assistance to unload
the shipment.
It is important that the box or crate be carefully inspected for any signs of exterior damage or puncture damage
that might be caused by a forklift. If you notice any damage, please note this on the Bill of Lading to establish
your claim. The trucking companies will avoid assuming liability if no claim of damage to the container is made at
the time of receipt, and it will become difficult to establish damage claims if damage is not noted in the Bill of
Lading.
STEP 2. UNLOADING SHIPMENT
After the driver unloads the crate from the truck using the lift, you will need a drill with a Phillips head to remove
the screws. Even though the tiles are individually boxed, remove the panels carefully and avoid dropping them.
This could cause cracks. Best thing to do if you are not ready to install is to remove the top and leave the
individually boxed panels in the crate until you are ready.