Decorative Metal Installation Instructions

page 3
Set Posts
1
In-Ground
Surface Mount
18 in.
45,72 cm
RESIDENTIAL PANELS
Dig or set posts at 96-3/8 in. on center
Area between posts should measure 94-3/8 in
HEAVY DUTY PANELS
Dig or set posts at 94-3/8 in. on center
Area between posts should measure 92-3/8 in
Locate post placement and set in the following order along the string line:
A. Gate posts (see gate installation steps to ensure proper spacing)
B. End/corner posts
C. Line posts
If using an In Ground Post, dig holes 18 inches deep and at least 6 inches wide.
Or, if using a Surface Mount post, use masonry drill and anchor bolts to set post in proper position.
A. Posts for Residential grade panels should be set at 96-3/8-in on center
B. Posts for Heavy Duty grade panels should be set at 94-3/8-in on center
• Make sure posts are in line and spaced correctly.
• Using a level, make sure posts are plumb, level and square.
• Allow 24 hours for concrete to cure.