Installation Guide

11
545 Tilton Road, Egg Harbor Twp, NJ 08215 | 877.420.7245 | sales@finyl-line.com
Fig. 13
Fig. 14
Fig. 15
Fig. 16
2
3
4
5
6
7
Assemble rail section. Set rail section on top of spacer and
against post. Using a level, hold railing section at proper pitch,
then shift section up or down creating equal baluster spacing
for each post. After rail is at proper position, hold in place with
clamps (Fig. 13).
Align Angle Swivel Bracket in position establishing bracket height
and the angle rotation of bracket. An additional
7
8
" will need to be
added to length. This second mark will be the cut line for the rail
ends. Repeat this step for each end (Fig. 14).
After all ends of rails have first mark established, remove clamps
from rail assembly. Mark the additional second mark
7
8
" to rail
ends as described in Step 3 and cut rail ends to length.
After cutting rail ends, place Angle Swivel Brackets over the
ends of each rail. Set rail section back on the spacer between
the posts, re-establishing pitch of bracket angle and clamp into
position (Fig. 15).
Pencil mark the four screw holes in each bracket (Fig. 16).
Pencil mark the position that the bracket is at along with the base
(Fig. 16).
Remove clamps from rail assembly and remove rail assembly
from between posts. Pre-drill marked holes from Step 6 into post
with a
1
8
" drill bit.
Clamp