Use and Care Manual

READ THESE INSTRUCTIONS
CAREFULLY BEFORE USE.
Mix the 2 components only once you are ready
to apply the product.
A NOTE ABOUT CONCRETE The concrete floor must have been poured at least 90 days
prior to being coated. Perform a humidity test; the humidity level should be below 4%.
If the test fails, do not apply TO/GO 100% solids epoxy.

Summary of content (4 pages)