Installation Guide
Take measures of walls, windows and openings
in the room and round up to the nearest foot. It
is recommended to add 15% for waste.
Must moldings are installed with a 90 degree
angle joint. Cut 2 pieces of molding with a 45
degree angle each piece and together they
make 90-degree angle. Use WPB Cement to
glue the ends of the boards. On both sides place
fasteners 2” from the end.
First install the longest pieces. If you are
right-handed it would be better installing coun-
terclockwise, if you are left-handed, it would be
better installing clockwise.
Along the back of molding apply construction
adhesive. Press molding against the wall. To
secure molding, use nishing nails into place.
Apply caulk in remaining gaps and smooth with
putty knife or nger. Use caulk or light weight
spackle to ll in holes. Use latex paint to touch‐
up molding as needed.
Install moldings
1
2
m-trim.com