Instructions / Assembly

18
VALVE OPERATION
Follow the instructions below for correct valve operation and inflation and deflation procedures.
The board’s inflation valve is located near the nose of the board.
To close off the valve for inflation, make sure that the center valve pin is in the UPposition. If it is in
the “DOWN position, press down on the valve pin and turn it counter clockwise until it pops up.
To open the valve for deflation, press down
on the valve pin and turn it clockwise so it
locks down.
Be careful of any sand or debris around the
valve area when deflating as small particles
could become airborne with the release of the
air pressure.
Always lock the valve cover over the valve
stem when in use. This will prevent accidental
air release and transfer of any particles into
the air chambers.
BOARD INFLATION STEPS
1. Unscrew the valve cap, push the button in and turn it clockwise
to make sure that the valve is in the “Pin Out” position.
2. Make sure the pump hose is connected to the “Inflate” outlet.
3. Attach the pump nozzle to the valve receptacle.
4. Start pumping air into the board by sliding the pump piston up
and down. Inflate until you reach the required pressure.
Minimum pressure for proper ISUP operation is 12psi. The
maximum pressure is 15psi.
5. After inflation, tighten the valve cap. Only the valve cap can
prevent air release.
TIP: If the pump piston starts to squeak, apply some spray silicone on the piston shaft.
MAXIMUM AIR PRESSURE FOR THIS PRODUCT: 15psi
WARNING: DO NOT OVERINFLATE THE BOARD. IT WILL VOID YOUR WARRANTY.
HIGH PRESSURE PUMP USE
WARNING: The pressure gauge is a high-precision meter. Please handle in with care during use and
transportation.