Full Product Manual

11
CBO-500 Assembly Instructions
After the Galvannealed Steel Plate has been set and the
Insulation Boards placed on top of it, you are now ready
to set the Hearth into place. Line the Front Hearth piece
up with the front of the Oven base. As you can see, the
Insulation Boards are not exposed to the elements and
cover the entire Main Hearth.
1
Push the Main Hearth into place so there is a tight fit with
the Front Hearth.
2
Remove the Front Hearth piece and place the Dome over the
top of the Main Hearth. Make certain the front of the Oven
is lined up, then replace the Front Hearth. Attach the Anchor
Plate to the top of the Oven.
3
Lay the Insulating Blanket over the top of the Oven. Cut
out a hole for the Flue Pipe, and cut the Insulating Blanket
to line up with the front of the Oven. If you have any extra
insulation, put it on the top of the Oven.
Note: Industrial-grade aluminum foil may be placed over the
insulation for moisture protection.
Note: It is important that you use all of the insulation
supplied to avoid a possible fire.
4
Cut the back of the Insulating Blanket with a razor blade
and tuck it into place. Pull the sides of the Insulating Blanket
around the back of the Oven. You can tie the insulation with
metal straps, or aluminum tape, or just leave it in place.
5