Instructions / Assembly

CG2053904-RG Page 12 of 22 20150821-V0
Step 12. Tighten the bolts and nuts in steps 9, 10 and 11.
Step 13. Assembly the temperature gauge (5) to lid (1). Then assembly smoke stack (2) to the lid
(1) and finally assembly the damper (3)..
Hardware required: Bolt C x 2 pcs, Flange nut D x 2 pcs, Cap nut G and spring H x 1 pc each.
Step 14. Assembly handle (4) to the lid
Hardware required: Bolt C x 4 pcs, flange nut D x 4 pcs