PROGRAM CYCLE
Use this feature to manually operate watering programs. You can run
the entire program or start anywhere within the station sequence of
the program.
Note: Only the stations with an assigned run time in the program will
operate during the program watering cycle.
1. Turn the function dial to the
Manual
Program Cycle
position.
2. Select Program
A
,
B
,
C
or
D
with the
Program
switch.
3. Press the
NEXT
button to select the first station of the watering
sequence (if other than the station number displayed).
4. Press the
ON
button to start the watering cycle. Watering will start
with the selected station and will be followed by all subsequent
stations. The display will show the run time remaining for the
operating station.
Note: You may advance through the stations by pressing the
NEXT
key for the next station. To terminate operation at any time, press
the
OFF
button.
5. Leave the function dial in the
Manual
Program Cycle
position until the manual operation is complete, then
return the dial to the
Run
position.
OFF AND RAIN DELAY
Use this feature to turn off controller operation for indefinite periods of
time (Off mode) or for a selected number of days (Rain Delay mode).
Turning Off the Controller
Turning the function dial to the
Off / Rain Delay
position places
the controller in the Off mode. After a 2-second delay, any current
watering activity will shut off and all subsequent watering program
activity will be suspended. As long as the function dial is in the
Off / Rain Delay
position, the controller will remain in the Off
mode. The controller clock continues to update current time and date,
and all watering program information is retained while in the Off
mode. Normal controller operation is resumed by simply placing the
function dial in any other position.
Using the Rain Delay Mode
The Rain Delay mode enables automatic watering to be delayed from
1 to 7 days. At the end of the selected delay period, the controller
resumes automatic operation. (
CONTINUED)
Operating the Controller