Use and Care Manual

TYPICAL EVOLVE STONE AT WOOD FRAMING TO FOUNDATION WALL DETAIL
EVOLVE STONE
7/16" OSB/Plywood Sheathing
Type I or II WRB
1/8" Rainscreen drainage mat
with fabric - Keene Driwal or
equal
6" +/-
Heavy vertical bead of
TREMCO TREM GRIP.
Allow 1/8" air gap
after EVOLVE STONE is
in place.
Tremco 171 Primer
on back of EVOLVE
STONE
1"
SEE EVOLVE STONE INSTALLATION OVER
CONCRETE/CMU
Concrete or CMU wall
Prep wall prior to install of Tremco
171 Primer
Follow Tremco's instructions as to
wall prep and installation of
the product.
SPECIAL NOTE: 1/8" Air gap - MAINTAIN FOR
DRAINAGE / DRYING
Tape or sealer strip between OSB
and concrete. Cover with WRB.
NOTE:
Where stone spans wood framing and
masonry - Use a combination of the pin
nailing & glueing methods as necessary
DETAIL #14