Instructions / Assembly

Universal Walk-In Bathtubs 5701 NW 35 Avenue Miami, FL 33142 PHONE: 877-360-4454 FAX: 866-560-1060 www.universaltubs.com
Page 7
OPERATING INSTRUCTIONS
OPERATING INSTRUCTIONS
INSTALLATION PREPARATION
INSTALLATION PREPARATION
1. Check the floor area where the tub is to be installed.
a. Clean area of any debris or trash.
b. Use a 5 or 6-foot level and determine if the floor is level. If the floor is not level, adjust all 6 leveling feet to perfectly level the tub.
NOTE: IT IS IMPORTANT THAT ALL LEVELING FEET ARE COMPLETELY TOUCHING THE FLOOR
AND LEVEL FOR THE DOOR SYSTEM TO WORK PROPERLY.
2. Check to ensure that the drain piping has been “roughed-in” at the proper location.
3. Ensure that the proper electrical service has been installed at the pump location. See electrical requirements in the manual (on
following page).
Model 30x53
Installation Instructions
P: 1-866-633-4882 www.meditub.com
100 East Mineola Avenue, Valley Strem NY 11580
MediTub
Where Safety Meets Luxury
Model 30x53
Installation Instructions
P: 1-866-633-4882 www.meditub.com
100 East Mineola Avenue, Valley Strem NY 11580
MediTub
Where Safety Meets Luxury