Instructions / Assembly

Page 51 of 72
5.6.12. Attach the tube with threaded inserts installed to the platform handrail post and the
horizontal picket closure bracket using 5/16”-18 x 1” long hex bolts and 5/16” flat
washers but do not tighten fully (FIG. 5.20).
5.6.13. Repeat the steps above until all five 1 1/2″ diameter round tubes and curb have been
installed then tighten all fasteners securely. For the curb, use the hole which is 1/2”
above the lowermost hole in the platform post and horizontal picket closure bracket to
align the curb correctly.
FIG. 5.20