ALUMINIUM Greenhouse Rose / Orchidee Technical changes reserved.
Dear garden friend, Congratulations for the purchase of an aluminum greenhouse from . The erection is simple. First read the mounting instruction and follow this step by step. Parts and piece list Start with the basic kit (please do not open all the boxes at the same time) and do not confuse about the numerous single parts. Before you start with the assembly please check with the piece list, if all the parts are there.
Assembly course gable (see also description from p.12 on) (View from the outside) Step 1 *Rose *Orchidee G la la zi zi ng ng 730 x 728 1048 x 728 G angle bracket Pos.1 Frame of doors left Pos.1.6 Frame of doors right with hinge borings Pos.1.7 Step 2 Floor profile Pos.1.1 Tallow-drop srew 4,2x13 Pos.12 (screw down only after installation of door = (alignment possibility) Step 4 Step 3 Tallow-drop screw 4,2x13 View from inside Connection sheet Pos.2 Crossbeam Pos.1.
Assembly course eaves and skylight for ex. back wall gable Step 8 h us op t 2.1 s. Po le ket fi c o ra pr or e b Flo angl on Step 9 insert lateral glazings Step 10 Step 11 Ins ve roo g ert .2 s.2 o sP lateral stay bars enlarged! Insert lateral stay bars Pos.2.3 at top into grooved profile and at bottom into the floor profile. Push straight on up to glazing and "thread" pane. Screw down ridge and grooved profiles at gable with end plate Pos.
Screw down with round connection sheet Pos.5 from inside with screws M6x12+nuts. Step 15 Glazing of eaves and skylight and stay bars to push in completely (skylight window important!) Place door gable in front and screw down Screw angle bracket Pos.6 in with screw 4,2x13 Step 16 Pos.1-5 s.1 -1 -9 Pos.1-3-1 Pos.1-2-1 -2 s.2 Po Pos.2-3 Pos.1-6 Pos.1-7 Pos.1-2-1 -4 -2 Po s.1 -1 -9 -5 s.1 s.1 Po -8 s.3 s.1 Po s.1 Po Po -1 -3 s.3 Po s.3 Po Pos.1-4 Po -2 s.4 Po .
Please check according to tables if the components are complete Contents of main box - basic constructionProfiles for both gables Detail Pos. 1.1 Designation Floor profile II -gable- 1.2.1 Edge stay bar left 1.3.1 Edge stay bar right 1.4 Verge flashing profile 1.5 Verge flashing profile right Verge flashing profile 1.5.2 left right with Borings 1.6 Frame of doors Profile with slope 1.7 Frame of doors 1.8 Frame of doors 1.8 1.9 left right Profile w. slope a.
Accessories bag basic construction Position Detail 1 Angle bracket / floor profile 4 Connection sheet 4 Connection sheet35x90 2 4 Ridge / grooved end plate 6 5 Connection sheet, round 2 2 Verge flashing profile/frame of doors 3 Fixing crossbeam-back wall 7 Edge stay bar - boring crossbeam 4 Cover 4 8 Gutter piece 2 9 Gutter stopping 2 10 Sealing of door sill Tubing section 760 lg 1 13 14 We recommend to use hexagon head cap wood screws and pegs included for pegging.
Profiles for skylights Detail Pos. Designation 4.1 Window profile roof 2 541 4.2 Window profile roof 2 953 Amount/Length Contents accessories bag skylight Detail Pos. * 1 2 3 4 5 sealing is bunched in one * Annotation: hank for all the doors and windows, cut to Designation Amount/Length 2 1 T-sealing Hexagon bolt M6x12 + nut 4 1 3 Angle bracket / skylight 4 Assembly angle w. setscrew Allan key 641 1052 size please. Angle bracket Pos.
Profiles for divided revolving door -at the bottomDetail Pos. 5.3.1 5.6 5.7 5.9 5.8 Amount / Length Designation Door profile at the bottom Door profile left with borings for sash lock Door profile right with hinge borings Door profile w. cross holes top Rectangular tube w. cross holes 1 700 1 734 1 734 1 700 1 740 Accessories bag Geteilte Tür -untenDetail Pos.
Profiles for divided revolving door -topDetail Pos. 5.1 5.2 5.3 5.4 Special accessories -can be delivered for an extra charge- 5.4.1 Amount / Length Designation Door profile left 1 x 1102 Rose / 1 x 1285 Orch. Door profile with Hinge borings right 1 x 1102 Rose / 1 x 1285 Orch. Door profiles top Door profile w.
Profiles for back wall window Detail Pos. 5.1.2 5.2 5.3.1 5.4.2 Amount / Length Designation Door profile w. borings left 1 x 1102 Rose / 1 x 1285 Orch. for sash lock 1 x 1102 Rose / 1 x 1285 Orch. Door profile right with hinge borings 1 700 Door profile top Door profile w. borings for at the bottom 1 700 window opener Accessories bag back wall window Detail Pos.
Foundation frame (extra accessories) Profiles for foundation frame Detail Pos. Designation II Rose Amount/Length mm Orchidee III III IV 2 2199 2 2033 2 2199 2 3091 2 2835 2 3091 2 2835 2 4149 Angle bracket/foundation frame 40/40 x 135 4 135 4 135 4 135 4 135 Fixing plate (stay bar - foundation frame) 10 135 10 135 10 135 10 135 6.1 Foundation frame profile 6.2 Foundation frame profile 6.3 6.4 Assembly of foundation frame Each foundation frame is to turn into the floor profiles.
Good advice for a quick and perfect assembly of the greenhouse from KGT Most of the assembly can be done by you alone. The assembly for gable and lateral walls takes 2 – 4 hours according to your skills. It is best if you have further two persons being able to hold it for approx. half an hour when putting the greenhouse upright. If you want to go on mounting it alone you have to look for a secure, suitable mounting course by means of stay bars, ladder or other fixings.
On the square head of the angle bracket you detach the edge stay bars pos. 1.2 + pos. 1.3 (length 1447 mm). Take care that the groove is on the top! Do not position any triangular glazing onto the frame of doors. The verge flashing profiles in pos. 1.4 and 1.5 must be detached onto the slopes and be joined together with the profile of the frame of doors by means of a trapezoid clamping plate.
Now the second gable in the foot is to connect with the floor lengthwise profile in the same way already known. Push the grooved profile and ridge profile into the nuts / slots of the gable profiles. Screw down as well with the grooved and ridge end plates. Now a small angle 30/30/20 x 2 can be screwed in by means of sheet metal screws 4,2 x 16 to secure the floor profiles (see step 15). If you use a foundation frame this angle not urgently necessary, as the foundation frame has an L-connection (see p. 13).
Question: Is it necessary to „seal“ the greenhouse or greenhouse glazing respectively ? Principally: not. However, we recommend to seal the horizontal transitions from the glazing to the profile (see sketch → broken lines ---) with neutrally linking, transparent silicon in order to have the most possible small amount of water and thus little dirt in the glazing reception. Advantage: In the long term the greenhouse has a better appearance.